| UNDERGROUND MINING |
| State |
Type(s) of Document(s) Required * |
Duration * |
Renewable? * |
How Often? * |
Transferable? * |
|
AR |
N/A |
-- |
-- |
-- |
-- |
|
AZ |
(3) Only if 5 or more acres disturbed. |
Life of mine. |
-- |
-- |
-- |
|
CA |
(1); (3)1 |
No set term. |
Y |
No set term. |
Y |
|
CO |
(1); (3) |
Life of mine. |
-- |
-- |
Y |
|
GA |
N/A |
-- |
-- |
-- |
-- |
|
IA |
(2); (4) Registration |
1 year. |
Y |
No limit. |
(2) N; (4) Y |
|
KY |
(1); (3); (4) |
-- |
(1) Y.
(3)(4) w/ permit application. |
1-5 years. |
Y |
|
KS |
(1); (2) |
1 year. |
Y |
Yearly. |
(1) Y
(2) -- |
|
ME |
(1); (3)2 |
5 years. |
Y |
Every 5 years. |
Y |
|
MD |
(4) Impacts to surface areas >3 acres only. |
5 years. |
Y |
5 years. |
Y |
|
MO |
(1); (3)2/3 |
5 years. |
Y |
Unlimited. |
-- |
|
NV |
(3) |
Life of mine. |
N/A |
N/A |
Y (Approval required) |
|
NM |
(1); (3) |
Life of mine. |
-- |
-- |
Y |
|
NY |
(1); (3); (4) |
(1) Up to 5 years.
(3)(4) Life of Mine. |
Y |
Every 5 years. |
Y |
|
OH |
(1) |
Life of operation. |
-- |
-- |
Y |
|
OK |
(1); (3) |
(1) Life expectancy.
(3) Surface disturbance. |
(1) Annual fee. |
-- |
(1) & (3) No. |
|
OR |
(1); (3)2 |
Life of mine. |
Y |
Yearly. |
Y |
|
PA |
(1); (3); (4) NPDES |
(1)(3) Life of operation.
(4) 5 years. |
(1) N/A
(3) Amendable
(4) Y |
(3) When necessary.
(4) Every 5 years. |
Y |
|
SC |
(1); (3) |
Life of mine. |
Y |
Varies. |
Y |
|
SD |
(1); (2); (3)2
(SDCL 45-6 & -6B) |
(1)(3) Life of mine.
(2) Annual. |
(2) Y |
(1) Yearly fee & report required.
(2) Annual. |
Y |
|
TN |
(1); (3) |
(1) 5 years. |
(1) Y. |
(1) 5 Years. |
(1) Y |
|
VA |
(1); (2); (3) |
Life of mine. |
(1)(2) Y.
(3) Can be revised. |
(1)(2) Annual. |
(1)(3) Y (after 7/1/96).
(2) N |
|
WV |
(1)4 |
1 year. |
Y |
Yearly. |
Y |
|
WI |
(1); (3) |
Life of project. |
-- |
-- |
-- |
|
WY |
(1); (2); (3) |
Life of mine. |
N/A |
N/A |
Y |
| SURFACE MINING |
| State |
Type(s) of Document(s) Required * |
Duration * |
Renewable? * |
How Often? * |
Transferable? * |
|
AL |
(1); (3) |
(1) 1 year.
(3) Life of operation. |
(1) Y.
(3) Continued. |
(1) Annually. |
(1) N. |
|
AR |
(1); (3) |
5 years. |
Y |
Every 5 years or sooner if necessary. |
Y |
|
AZ |
(3); (4) Cyanide leach |
(3) Life of mine. |
Y |
(3) If changed.
(4) Annually. |
(3) Y.
(4) N. |
|
CA |
(1); (3) |
No set term. |
Y |
5 years. |
Y |
|
CO |
(1); (3) |
Life of mine. |
-- |
-- |
Y |
|
GA |
(1); (3) |
Life of mine. |
-- |
-- |
Y |
|
IL |
(1); (3); (4) Annual operating fee |
(1)(3) 3 years.
(4) 1 year. |
(1)(3) N.
(4) N/A. |
(1) N/A.
(3) Deter-mined by Dept.
(4) 1 year. |
(1)(3) Y.
(4) N. |
|
IN |
(1); (3) |
(1) 1 year. |
(1) Y. |
-- |
-- |
|
IA |
(2); (4) Registration |
1 year. |
Y |
No limit. |
(2) N.
(4) Y. |
|
KS |
(1); (2); (3) |
(1)(2) 1 year.
(3) 3 years. |
(1)(2) Y.
(3) Y (may be extended) |
(1)(2) yearly. |
(1)(3) Y.
(2) N. |
|
KY |
(1); (3); (4) |
-- |
(1) Y.
(3)(4) With permit application. |
1-5 years. |
Y |
|
ME |
(1); (3)1 |
5 years. |
Y |
Every 5 years. |
Y |
|
MD |
(1); (2); (3) |
(1)(3) 5 years.
(2) 1 year. |
Y |
(1)(3) Every 5 years.2
(2) Annual. |
(1)(3) Y.
(2) N. |
|
MS |
(1); (3) |
5 years. |
Y |
5 years. |
Y |
|
MO |
(1); (3) |
1 year. |
Y |
Annually. |
Y |
|
NV |
(1) "Zero discharge" water pollution control; (3) |
(1) 5 years.
(3) Life of mine. |
(1) Y.
(2) N/A. |
N/A |
(1) N.
(3) Y (Approval required). |
|
NJ |
(1) |
1 year. |
Y |
Annually |
Y |
|
NM |
(1); (3) |
Life of mine. |
-- |
-- |
Y |
|
NY |
(1); (3); (4) |
(1) Up to 5 years.
(3)(4) Life of mine. |
Y |
Every 5 years. |
Y |
|
NC |
(1); (3) |
10 years. |
Y |
(1) 2 years prior to expiration.
(3) Anytime mining or reclamation plans change. |
(1) Y.
(3) Y (with permit). |
|
OH |
(1); (3)3 |
10 years. |
Y |
No limit on number of renewals. |
Y |
|
OK |
(1); (3) |
(1) Life expectancy.
(3) Continuous with permit. |
(1) Y. |
(1) Annual review. |
(1) No. |
|
OR |
(1) |
Life of mine. |
-- |
Yearly. |
Y |
|
PA |
(1); (2); (3); (4) NPDES |
(1)(3) Life of operation.
(2) 1 year.
(4) 5 year. |
(1) N/A.
(2)(4) Y.
(3) Amendable. |
(2) Annually.
(3) When necessary.
(4) Every 5 years. |
(1)(3)(4) Y.
(2) N. |
|
SC |
(1); (3) |
Life of mine. |
Y |
Varies. |
Y |
|
SD |
(1); (2); (3)3
(SDCL 45-6 & -6B) |
(1)(3) Life of mine.
(2) Annual. |
(2) Y. |
(1) Yearly fee & report required.
(2) Annual. |
Y |
|
TN |
(1) |
5 years.
|
Y |
5 years. |
Y |
|
TX |
(1); (3)3; (4) Safety Barrier Certificate |
(1) 10 years.
(4) Life. |
(1) Y. |
(1) 10 years. |
Y |
|
VA |
(1); (2); (3) |
Life of mine. |
(1)(2) Y.
(3) Can be revised. |
(1)(2) Annual. |
(1)(3) Y (after 7/1/96).
(2) N. |
|
WA |
(1); (3) |
(1) Until terminated.
(3) Until needs to be modified. |
(1) Pay every year. |
-- |
(1) Y. |
|
WV |
(1) |
1 year. |
Y |
Yearly. |
Y |
|
WI |
(1); (3) |
Life of project. |
-- |
-- |
-- |
|
WY |
(1); (2); (3) |
Life of mine. |
N/A |
N/A |
Y |