| State |
What is the Amount Per Acre Required Under Your Bonding Procedures? |
|
AL |
$2,500/acre. |
|
AR |
New quarry law has a fixed bond amount per acre ($1,100.00). |
|
AZ |
300 party actual costs. |
|
CA |
Bond values established on the basis of threat to water quality, not acreage disturbed. SMARA: cost of reclamation. |
|
CO |
We bond for the actual cost to reclaim the proposed or actual affected area. |
|
GA |
Up to maximum of $2,500/acre. |
|
IL |
Between $600-$5,000/acre. |
|
IN |
Between $1,000-$5,000/acre. |
|
IA |
Minimum $2,000/acre. Beyond 1 acre, approximately $1,000/acre. |
|
KS |
$250/acre minimum & $1,500 maximum. (K.S.A. 49-615.) $400/acre sand & gravel & $600/acre all other types mining (in revision). |
|
KY |
$100/acre minimum, $500/acre maximum, $2,000 minimum total. |
|
ME |
No specified rate is contained in the rules. Calculated as part of the application phase. |
|
MD |
$1,250/acre, $8,000 minimum. |
|
MS |
$500 minimum, $2,500 maximum. |
|
MO |
Industrial minerals = $8,000 minimum, $500/acre for each acre over 8. Metallic minerals = $1,000/acre of waste management area, minimum $20,000/permit. |
|
NV |
Bond is calculated on cost to the state to reclaim per permit requirement. |
|
NJ |
N/A |
|
NM |
Cost of reclamation by a third party. |
|
NY |
$2,500/acre average -- no set amount, but minimum of $2,500/site. |
|
NC |
(Rate structure on file at IMCC offices.) |
|
OH |
$500/acre affected or proposed to be affected by mining. $2,000 minimum. |
|
OK |
$500 to $1,000 per acre. |
|
OR |
Actual cost of reclamation as determined by the Dept., including supervision & contracting costs. |
|
PA |
Minimum $5,000/acre (rate chart on file at IMCC office). |
|
SC |
0-10 acres = $10,000; 10-15 acres = $15,000; 15-25 acres = $25,000; >25 acres = Third party estimate required. |
|
SD |
Under 45-6B large scale bond is based on actual cost to conduct reclamation as if state would have to hire third party contractor. Small scale is maximum $2,500. 45-6 requires $500/acre or statewide $20,000 blanket bond. |
|
TN |
$600. |
|
TX |
Actual cost of reclamation plus 10% administrative fee. |
|
VA |
$1,000 per disturbed acre. (See Reg. Sect. 3.6.2 & 3.) |
|
WA |
(Rate schedule on file at IMCC offices.) |
|
WV |
Not less than $600 for each acre, not to exceed a maximum of $1,000/acre. The minimum amount of bond furnished shall be $10,000. |
|
WI |
No per acre amount. Bond must reflect actual cost. |
|
WY |
Site specific. |